Ben Lomond put in-house engineering and fabrication to work on three very different culvert installations.

Watch Film ↓
CSLB #1115805

BEN LOMOND / CULVERT REPLACEMENT

Start with the constraint.
Build the approach.

At Ben Lomond, each culvert crossing posed a different engineering problem. One had an existing steel obstruction, another had no room for a receiving pit, and the largest ended at a creek with limited equipment access. Phoenix designed and fabricated the tooling for each crossing and adapted its own equipment to install all three. The crossings below are shown in the order we built them.

The construction sequence below differs from the film’s presentation order. Dimensions distinguish the pipe’s inside diameter (ID) from its outside diameter (OD).

3
Crossings, each with its own engineered approach
36 in
First crossing: RCP ID / 44 in OD
30 in
Second crossing: RCP ID / 36 in OD
120 in
Third crossing: RCP ID / 144 in OD

01 / CONSTRUCTION SEQUENCE

36-inch RCP: A cutting head designed for the existing culvert

The first crossing followed the alignment of an existing 18-inch corrugated metal pipe (CMP). Phoenix designed and fabricated a custom head that cut through the old metal pipe and allowed a new 36-inch-inside-diameter reinforced concrete pipe (RCP) to be installed in its place. The cutting head was built specifically for the existing pipe and the new culvert alignment.

36-inch ID / 44-inch OD RCP. First installed; shown second in the project film.
36-inch ID / 44-inch OD RCP. First installed; shown second in the project film.

02 / CONSTRUCTION SEQUENCE

30-inch RCP: Guided installation without a receiving pit

The next crossing exited directly onto a hillside. There was no space for the equipment normally used in the receiving pit of a guided boring method (GBM) installation. Phoenix kept the guided pilot stage, then designed a lightweight front reamer to transition to guided auger boring with a 36-inch steel casing, matching the outside diameter of the new concrete pipe. Short pilot rods could be retrieved at the slope without receiving-pit equipment.

Once the casing was in place, the crew used pipe substitution: the new jacking-grade RCP displaced the temporary steel casing, which was removed in sections at the hillside. The approach preserved pilot guidance while fitting the space available at the exit.

30-inch ID / 36-inch OD RCP. A guided installation adapted to the hillside exit.
30-inch ID / 36-inch OD RCP. A guided installation adapted to the hillside exit.

03 / CONSTRUCTION SEQUENCE

120-inch ID RCP: A sectional jacking shield for a creekside exit

The last crossing was about 144 feet long, but the concrete pipe measured 120 inches inside and 144 inches outside. At that size and length, a conventional tunnel boring machine was a poor economic fit. Retrieving a full-sized cutterhead at the creek would also have been difficult.

Phoenix designed a sectional shield for pipe jacking and adapted its ADB48, originally designed for pipe up to 48 inches, to push the 144-inch-OD concrete pipe. Engineering checked the anticipated jacking loads and ground conditions. The team built the thrust adapter, shield and excavation tooling, and adapted the hydraulics so the front-end excavation equipment could run from the ADB48 power pack. At the creek, the shield could be broken down and the sections retrieved individually by excavator.

120-inch ID / 144-inch OD RCP. A sectional shield designed for creekside recovery.
120-inch ID / 144-inch OD RCP. A sectional shield designed for creekside recovery.

DESIGN THROUGH DELIVERY

The difference was
the ability to adapt.

All three crossings relied on the same ability: the people who designed and fabricated the tools also worked with the crews who had to use and recover them. The result was a different installation approach for each constraint, with one team accountable from design through construction.

PROJECT FILM

Watch the project film

Project-specific approaches developed for these conditions and constraints. The film’s second crossing is the 36-inch-ID installation completed first.